Sunday, October 18, 2009

1st Brick Wash (2/3)

So all the bricking has been completed and inset have been installed in the windows..

1// Excess soil, backyard looks tiny while this mound is there, we need to ask our SS to spread this down either side of the property rather than in the outdoor room as we will be cementing immediately after handover

2// Our neighbours have gone SO close to the fence line, the actual line is about 5 inches on the otherside of the drainage ditch.

2// Living Room and Master Ensuite windows

3// Frontage (Master Bedroom Windows)
4// Carport

No comments:

Post a Comment