Okay, we had our walkthrough, a few things still standing out that are not done yet:

Plumbing to toilets/basins/kitchen/laundry
Aircondition and Heating vents
Cement (driveway, laundry and watertanks)
Kitchen cupboards need to be replaced as they are the wrong size, hence rangehood not installed
Final paint
1 or 2 downlights
Room tiles need water proofing
Raised tile or two in dining room

But enough of what has not been done, check out what HAS been done!

1// Our Bathroom/Ensuite Benchtop - you can 'just' see the checkers

2// Sweet modern square recessed basins in bathroom and ensuite

3// Ensuite Shower with red pinstripe to make it go faster

3// Ensuite

4// Floor tile and cupboard kicker combo